MIL-DTL-6396F
TABLE III. Phase II tests.
Tank Types
Tests
Para No.
I
II
III
Examinations
4.5.1
X
X
X
Handling (Type II tanks only)
4.5.20
-
X
-
Installation
4.5.21
X
X
X
Capacity
4.5.4
X
-
X
Simultaneous slosh and vibration 1/
4.5.6
X
X
X
Vibration
4.5.7
X
-
X
Slosh 2/
4.5.8
-
X
-
Low temperature leakage
4.5.22
X
X
X
Stand test
4.5.23
-
X
X
Accelerated loads test
4.5.25
X
X
X
Proof pressure
(Type I and III tanks)
4.5.26
X
-
X
Burst pressure
(Type II and III tanks)
4.5.27
X
-
X
Fitting tests
4.5.28
X
X
X
Gunfire
4.5.24
-
X 3/
-
X Indicates test applicable
- Indicates test not applicable
1/ Simultaneous slosh and vibration tests not mandatory for Type II tanks, Classes A and B.
2/ Slosh test not required when simultaneous slosh and vibration test is conducted.
3/ Type II, Class B tanks only.
4.2.3 Variation of basic construction. Variation of basic construction, which has been
granted first article inspection phase I approval, shall be indicated by a dash number or lettering
system. Details of each phase I variation shall be submitted to the procuring activity which, at its
discretion, may extend phase I approval to the variation.
4.3 Conformance inspection. Conformance inspections shall consist of:
a. Individual tests (see 4.3.1).
b. Sampling plans and tests (see 4.3.2).
4.3.1 Individual tests. Each tank shall be subjected to the following tests and examinations:
a. Examination of product
4.5.1.1
12